carries out all Class II Microbiological Safety Cabinet maintenance in accordance
with the requirements of BS EN12469 2000 or by company in house test codes.
On a normal service visit or commissioning tests the following checks are made.
We recommend that each unit is checked once every 6 months for:-
Six monthly check:-
|
1. |
Operation of all services and system controls. |
|
2. |
Filter and seal integrity tests. |
|
3. |
Inspection of the door mechanism for corrosion and damage. |
|
4. |
Inspection of main body and duct for corrosion and damage. |
|
5. |
Check alarm and airflow gauge for correct operation and calibration. |
|
6. |
Check anti-blow back device for correct operation. |
|
7. |
Pre filter changed if necessary. |
Twelve monthly check:-
|
8. |
All the above checks and also including Ki Discus test |
Air inflow measurement
- As per requirements of BS5726:1992 Part 3 Appendix A or by company in house
codes.
Using - Airflow Developments AV2 Anemometer.
Filter and seal integrity tests
- As per requirements of Appendix B of BS5726: Part 1: 1992. Results should
comply with Section 8.5 of BS5726: Part 1: 1992. .Cabinets fitted with double
exhaust HEPA filters should have each filter tested individually.
Using - Taylor Smoke generator and ATI forward light scattering photometer
Operator protection Ki Discuss tests
- Carried out to the requirements of BS5726 Part 1 1992 Section 12.1 and Appendix
D4 (Potassium Iodide method). The standard states that the unit shall only be
passed if the operator protection factor exceeds l x l05.
Using - Containment Technology KI Discuss Machine
Give full test certificate. - All test equipment where necessary is always calibrated and carries a full calibration test certificate. Any of these certificates are available on special request.